The level of “partnering”
employed in the Baileys project is also apparent in the
ongoing Dublin Port Tunnel project. The Cogan & Shackleton
Practice is engaged on a “design and build”
basis with the Main M&E Contractor. The project has
been taken from a conceptual preliminary design, through
a detailed design submission, to the current construction
phase design.
The Tunnel project is a multinational
venture and brings together many specialist manufacturers
and providers. Good communication and adherence to agreed
procedures and timetables has been maintained to the benefit
of the project and clients.